In order to make the drainage PPR fittings smoother, the drainage fittings should be installed after leveling. Now we will briefly introduce you to the installation key points of PPR fittings.
Indoor water supply and drainage construction must be carried out in cooperation with other professionals.
Before connecting the pipeline, first check whether there is any blockage in the pipeline. If the construction needs to be temporarily stopped, the nozzle should be blocked.
Before installation, holes must be reserved to match the civil work, and support should be buried.
The installation of water supply and drainage pipe fittings should be coordinated with the installation of other pipes.
And note that when crossing the firewall, the pipe fittings should be filled with non-combustible materials tightly, the PPR water pipe insulation material should also be flame-retardant materials, and the hanger should be fixed.
To ensure pollution-free safety and sanitation, PPR pipe fittings should be cleaned and disinfected before use. Various PPR pipe fittings should be clearly marked when laying.
Please remember that the vertical and horizontal pipes of PPR pipes should be as close as possible to the columns and beams. The installation of PPR pipes must not only be neat and beautiful, but also ensure quality.